IMPORTANT ANNOUNCEMENT: The new system went live on Monday, November 17, 2025. Anything filed after noon November 12th will not be viewable from this page.This page will no longer be accessible after 11/26/2025. Please go to KCC-Connect.

Document Number: 25-0083

Document Details

To view a document or form, you need Adobe Acrobat Reader.

Order Assessing Costs

Order Date: 1/28/2025
Tracking Number: 25-0083
Means Received: N/A
Synopsis: Order for Docket 'Application for Sunflower Electric Power Corporation ' Docket No. '25-SEPE-284-CON' Synopsis: 'In the Matter of the Joint Application of Sunflower Electric Power Corporation and The Lane-Scott Electric Cooperative Inc., for Approval of the City of Dighton Firm Energy, Capacity, and Load Following'
Files:
25-284 Order Assessing Costs [ 2654.4169921875 KB]

These web links contain scanned images of legal filings with the Kansas Corporation Commission. Printed copies from these links should not be considered official copies.

 

Site Map    |    Accessibility    |    Contact Us     |    Subscribe